Purchased Parts Pull
System – Case Study
Background of Case Study
Presentation of Case Study Results
Class Discussion of Case Study
RD011402
MeasureMeasure
AnalyzeAnalyze
ControlControl
ImproveImprove
Lean Six SigmaLean Six Sigma
采购零件拉系统
—案例分析
案例分析的背景
案例分析结果的发表
案例分析的课堂讨论
RD011402
ImproveImprove
Lean Six Sigma
Improvement Process Road Map
AnalyzeAnalyze ControlControlImproveImprove
Define
• Identify Problem
• Develop List of Customers
• Develop List of CTQ’s
from Voice of the
Customer
• Finalize Project Focus
and Key Metrics
• Complete PDF
Measure
• Map Business Process
• Map Value Stream
• Develop Data
Collection Plan
• Conduct Measurement
System Analysis
• Collect Data
• Conduct Process
Capability Analysis
Analyze
• Propose Critical X’s
• Prioritize Critical X’s
• Verify Critical X’s
• Estimate the Impact of
Each X on Y
• Quantify the Opportunity
• Prioritize Root Causes
• Conduct Root Cause
Analysis on Critical X’s
Improve
• Critical X’s Confirmed
• Develop Potential
Solutions
• Select Solution
• Optimize Solution
• Pilot Solution
Control
• Implement Process
Changes and Controls
• Write Control Plan
• Calculate Final Financial/
• Process Metrics
• Transition Project to
Future Owners
• Identify Project
• Translation Opportunities
MeasureMeasureDefineDefine
• Project ID Tools
• Project Definition Form
• Net Present Value
Analysis
• Internal Rate of Return
Analysis
• Discounted Cash Flow
Analysis
• PIP Management Process
• RACI
• Quad Charts
• Process Mapping
• Value Analysis
• Brainstorming
• Multi-Voting Techniques
• Pareto Charts
• C&E/Fishbone Diagrams
• FMEA
• Check Sheets
• Run Charts
• Control Charts
• Gage R&R
• Cp & Cpk
• SupplyChainAccelerator
Analysis
• Multi-Vari
• Box Plots
• Interaction Plots
• Regression
• ANOVA
• C&E Matrices
• FMEA
• Brainstorming
• Pull Systems
• Setup Reduction
• TPM
• Process Flow
• Benchmarking
• Affinity
• DOE
• Hypothesis Testing
• Force Field
• Tree Diagrams
• Gantt Charts
• Check Sheets
• Run Charts
• Histograms
• Scatter Diagrams
• Control Charts
• Pareto Charts
• Interactive Reviews
• Poka-Yoke
Revised 1-12-02
3Purchased Parts Pull System – Case Study
ImproveImprove
Learning Objectives
Learn how to review a case study with basic data and
make improvement suggestions
Learn the basic steps and calculations to present a Lean
solution
Understand all the possible Pull Platforms and how they
would apply in this case study
Determine the required measures for performance growth
Practice presentation skills
4Purchased Parts Pull System – Case Study
ImproveImprove
课程目的
学习如何评价案例中的基本数据及提出改进建议
学习发表精益解决方案的基本步骤和计算方法
理解所有可能的拉动平台以及如何应用在该案例分析中
确定绩效提高的评价指标
练习发表的技巧
5Purchased Parts Pull System – Case Study
ImproveImprove
What’s in It for Me?
Practice Replinishment Pull implementation
Discuss with the class all the possible barriers and
solutions for the case study
Gain understanding to apply in your environment
6Purchased Parts Pull System – Case Study
ImproveImprove
我学到了什么?
练习补充拉系统的实施
课堂讨论案例中可能的实施障碍及解决方法
理解在自己工作中应用的知识技能
7Purchased Parts Pull System – Case Study
ImproveImprove
Replenishment Pull Case Study
Replenishment Pull at Windows-R-Us
In order to minimize the impact of shortages and to reduce
inventory, I want to implement a replenishment pull system for
my glass raw material. My goal is to reduce the amount of labor
required to manage the raw material while reducing inventory.
By reducing labor required to manage the raw glass, we should
be able to concentrate on getting the other troublesome parts into
the facility. I want to reveal the details of my plan to my staff
next week.
John Smith
Manager of Tactical Procurement
8Purchased Parts Pull System – Case Study
ImproveImprove
补充拉系统案例
Windows-R-Us公司的补充拉系统
为了将零件短缺的影响最小化及减少库存,我希望
在玻璃原材料方面实施补充拉系统。我的目标是降
低库存的同时减少材料管理的工作量。通过减少管
理原材料的劳动量,我们可以集中精力处理其他棘
手的零件。我希望在下周向我们的员工展示详细的
计划。
John Smith
采购战略经理
9Purchased Parts Pull System – Case Study
ImproveImprove
Replenishment Pull Case Study (Cont.)
John sat in his Dallas, TX office one afternoon thinking about several issues facing him
in his new role as Tactical Procurement Manager. Since the recent reduction in force,
his group has been struggling to manage the material needed for production. The
result has been an increase in part shortages and inventory. Although excited about
solving this problem, he was concerned about his ability to design and implement a
pull system. Luckily, he had just attended a training course on replenishment pull
systems.
Bill Glass founded Windows-R-Us in 1988. The company produces windows for the new
home segment of the window industry. The company manufactures ten different
families of windows resulting in 100 different end items. The total sales in 1997 were
$180 million. The growth rate from 1993-1997 was 15% (CAGR) and ahead of industry
average. The products are produced in one facility located in Dallas (TX).
The facility in Dallas consists of two manufacturing areas. The first produces the
insulated glass subassembly and the second assembles the final product. Distributors
are the primary customer and are responsible for final delivery to the home-sites. In
general, this industry is subject to seasonality following the construction season.
10Purchased Parts Pull System – Case Study
ImproveImprove
补充拉系统案例
一天下午,约翰坐在位于德州达拉斯市的办公室内,思考着他自成为采购战略
经理以来所面临的几个问题。因为最近的人员精简,他的部门正在为保证生产
需要的材料而努力着,但结果往往是零件供应短缺或库存过多,尽管最近解决
了一些问题,但是他还是担心自己是否有设计和实施拉系统的能力,幸运的是,
他刚刚参加了一次补充拉系统的培训课程。
Bill Glass于1988年创建了Windows-R-Us公司。公司生产家装窗户。公司生产
10种不同的门窗系列共100种最终产品,1997年销售额$180百万。从1993—
1997年,增长速度达15%(CAGR)高于行业平均增长速度,产品在位于达拉
斯市的一个小工厂生产。
达拉斯的制造厂包括两个制造部门,第一个部门生产绝缘玻璃分装配,第二个
部门组装最终的产品,经销商是第一位的客户并负责最终将产品交付到用户手
中,一般情况下,该产业受建筑业季节性变化影响。
11Purchased Parts Pull System – Case Study
ImproveImprove
Replenishment Pull Case Study (Cont.)
During John’s assessment of the raw glass procurement process, he conducted
interviews and uncovered the following information.
From the Master Scheduler:
MRP generates all orders and action messages for raw material once per week
Schedule changes are common and probably drives excessive messages
Safety stock is not used but excess inventory exists due to the large number of
schedule changes.
From the Raw Material Commodity Buyer:
Only 15 unique raw glass part numbers
Lead time for the glass is 1 week (regardless of mix) and the supplier is very
dependable
Glass supplier runs the glass for the window company about once per quarter
Glass supplier has minimum shipment requirement of one truckload
(20 containers @ 300 per container)
Containers are 4' x ' and can be stacked 3 high
Various order frequency used to order raw glass (no real strategy)
12Purchased Parts Pull System – Case Study
ImproveImprove
补充拉系统案例
约翰在评价玻璃原材料的采购过程时,访问了一些部门并得到以下信息:
从主计划:
MRP每周一次生成有关原材料的所有订货和行动信息
计划变更很平常,可能产生额外的信息
安全库存未使用,但过剩的在制存货由于大量的计划变更而存在。
从原材料采购处:
只有15种特定的原材料种类
玻璃的交货期为1周(不考虑混型),供应商可信度较高
玻璃供应商为WINDOWS公司,每季度生产一次
玻璃供应商最小发货量为一卡车(20箱@每箱300块)
料箱尺寸是 4‘ x ’ ,最多可以码放3层料箱
玻璃原材料订货频次多变(没有固定的策略)
13Purchased Parts Pull System – Case Study
ImproveImprove
Replenishment Pull Case Study (Cont.)
From the Insulated Glass Production Manager:
Production consists of 5 steps (cut, sort, wash, assemble, bake)
Run 3 shifts per day
Steps are connected via conveyors and therefore run synchronous
Cycle time from glass cut to finished insulated unit is about 1 hour
Changeover from 1 family to the next is about 2 hours
Can cycle through the 15 families about once per week
From the Warehouse Manager
Is currently about 40% efficient with floor space (based on the haphazard ordering)
Employs 4 full time material handlers and 2 temporary cycle counters
John first gathered some information on the raw material parts (Exhibit 1). He
then performed some high level analysis on the parts (Exhibit 2). This analysis
should help him in identifying which parts make good candidates.
14Purchased Parts Pull System – Case Study
ImproveImprove
补充拉系统案例
从绝缘玻璃生产经理:
生产包含5个步骤 (裁切,分选,清洗,组装,烘烤)
每天分3班
工序是通过传输带运行,因此是同步运行
周转时间从裁切到成品产出为1小时
产品更换的换模时间为2个小时
15个系列产品可以每周循环生产一次
从仓库经理:
目前空置率为40%(由于摆放顺序随意)
4个专职的搬运工人和2个临时统计员
约翰首先收集到有关原材料的一些信息(表1),然后他又对原材料做了进
一步的分析(表2),这些分析能帮助他识别最佳选择的零件。
15Purchased Parts Pull System – Case Study
ImproveImprove
Exhibit 1
ADU=Average Daily Usage
16Purchased Parts Pull System – Case Study
ImproveImprove
表 1
ADU=平均日用量
17Purchased Parts Pull System – Case Study
ImproveImprove
Exhibit 2
18Purchased Parts Pull System – Case Study
ImproveImprove
表 2
19Purchased Parts Pull System – Case Study
ImproveImprove
Assumptions
Assumption Value
1 truckload is the minimum requirement
1 case is the multiple requirement
Warehouse Space Efficiency 60%
Service factor for safety stock 2
Beta for safety stock
"A" order frequency 5 days
"B" order frequency 10 days
"C" order frequency 40 days
20Purchased Parts Pull System – Case Study
ImproveImprove
假设
假设 价值
最小需求量至少为1卡车
需求量必须是1 整箱数量的倍数
仓库空间效率 60%
安全库存的服务水平 2
安全库存的Beta值
“A” 类订货频次 5 天
“B” 类订货频次 10 天
“C” 类订货频次 40 天
21Purchased Parts Pull System – Case Study
ImproveImprove
Presentation to the Staff
John continued to develop his proposal on the new pull system. Should all the parts go on
pull? What risks are there with pull? What impact will this have on inventory? What
impact will this have on transactions? What measures should we use?
Develop a 10 minute presentation to the staff on the process and impact of implementing
a raw material pull system. The presentation must contain the following:
The best part candidates to place on the new replenishment pull system
The number of transactions for the new system versus the old system
Calculate impact to # of transactions (% increase or decrease)
The size ($’s) of the glass inventory using replenishment pull
Calculate the maximum, minimum and average quantity of glass on-hand
Calculate inventory $ impact (% increase or decrease)
Determine square footage of floor space needed for the glass on pull
Recommend platform for generating the replenishment signal
Identify key measures for the process
Be prepared to respond to the following questions:
Did you make any assumptions?
What logic did you use to exclude parts?
22Purchased Parts Pull System – Case Study
ImproveImprove
向员工介绍
约翰继续进行关于新拉系统的设想,是不是全部零件都要拉动?拉动的风险有哪
些?对库存的影响有哪些?对定单的处理有哪些影响?应该用哪些指标衡量?
用10分钟时间向你的员工介绍实施拉系统的过程和影响,发表应包括以下内容:
在新系统中所包含的最合适应用拉动系统的零件
新系统对比旧系统的定单处理量
计算对定单处理量的影响 (% 增加或减少)
用于拉系统中玻璃库存的规模 ($’s)
计算现有玻璃数量的最大、最小值、平均值
计算库存价值的变化(% 增加或减少)
决定拉系统中库存玻璃的占用面积
建议的补充信号的可用平台(条件)
确定过程中的主要量测指标
准备回答下列问题:
你是否使用了假设条件?
用了何种逻辑清除多余零件?
23Purchased Parts Pull System – Case Study
ImproveImprove
Answer Sheet
Bad Pull Part Candidates
24Purchased Parts Pull System – Case Study
ImproveImprove
答案表
不利于拉动系统的零件
25Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Transactional Sizing Detail
26Purchased Parts Pull System – Case Study
ImproveImprove答案表:
事务处理详细
27Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Inventory Sizing Calculations
28Purchased Parts Pull System – Case Study
ImproveImprove答案表:
库存规模计算
29Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Inventory Space Calculations
30Purchased Parts Pull System – Case Study
ImproveImprove答案表:
库存面积计算
31Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Inventory Space Calculations (Pull Parts)
32Purchased Parts Pull System – Case Study
ImproveImprove答案表:
库存空间计算 (拉动零件)
33Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Inventory Space Calculations (Non-Pull Parts)
34Purchased Parts Pull System – Case Study
ImproveImprove答案表:
库存空间降低 (非拉动零件)
35Purchased Parts Pull System – Case Study
ImproveImproveAnswer Sheet:
Platform and Measures
Suggested Pull Platform?
_____________________________
Key Measures:
36Purchased Parts Pull System – Case Study
ImproveImprove答案表:
平台和量测
建议的拉动平台?
_____________________________
关键的量测:
37Purchased Parts Pull System – Case Study
ImproveImprove
Takeaways
Understand the impact of Replenishment Pull
Understand the steps and calculations for Replenishment
Pull
Gain better knowledge in what performance measures are
important
38Purchased Parts Pull System – Case Study
ImproveImprove
总结
练习补充拉系统的实施
课堂讨论案例中可能的实施障碍及解决方法
获得在自己工作中应用的知识技能
39Purchased Parts Pull System – Case Study