运维管理:如何使成本最小化、效率最大化?——IBM x86服务器虚拟化服务
Agenda•Data Center Challenges•Data Center Strategy•How IBM do it•Benefits & ROI Analytics•Success Story
Common Data Center ChallengesIncreasing complexityRising costsEnergy and cooling problems
Server total cost of ownership continues to grow, so you have motivation to reduce the number of servers neededWorldwide IT spending on servers, power and cooling, and management/administration*SpendingInstalled base(US$B)(M units)Power and cooling costs x8Server management and administration costs x4New server spendingMany servers, much capacity, low utilization = US$140B in unutilized server assets*Source: IDC Enterprise Server Research, 2007.
Complexity is often a result of unchecked server sprawlWhen you add servers as a stopgap measure to address a short-term demand, there is an immediate and lasting increase in cost, including:•Hardware costs•Management costs–More servers, more racks, more –IT staffstorage systems–Ongoing training–Distributed computing •Site and facilities costsenvironments that mostly sit idle, –Data center space, rack spacewith as little as eight percent of –Power, cooling, security, capacity utilizedmonitoring•Software costs–More servers that require more licenses–Management tools required to maintain performance
Migrate many applications into fewer imagesServer Data Center StrategySimplify IT environmentReduction of operations resourcesImprove application specific monitoring and tuningIT Infrastructure Energy Efficiency StrategyRemove physical resource boundariesIncreased hardware utilizationConsolidate many Application Allocate less than physical servers into fewer on Integrationboundary physical resource Reduce software boundariesConsolidate many centers licensing into fewercostsReduce system Reduce infrastructure management VirtualizationcomplexityState-of-complexitythe-ArtImprov e facilities Reduce physical managementfootprintsReduce staffing Integrated requirementsPhysical power BestImprove business managementConsolidationPractices resilience (manage Direct liquid fewer things better)coolingHot and cold aislesCombined heat Improved efficiency Improve operational and powertransformers, UPS, costsCentralizationchillers, fans, and pumpsImproved Free coolingOperationsConservation techniquesInfrastructure energy efficiencyImproved airflow managementFacility Infrastructure Energy Efficiency Strategy
IBM can drastically reduce the time required to implement a consolidation, because it has industry-leading processes and tools from its extensive server consolidation service capabilities:Collect—in a nonintrusive way—a snapshot of your existing environment−Applications and their performance demands−Utilization−WorkloadsAnalyze the gathered informationDevelop possible consolidation environmentsbased on different scenariosRecommend a post-consolidation environment
IBM has developed a consolidation methodology, based on its extensive experience, that comprises three distinct phases Service TaskService ProductService ElementDocument Client EnvironmentAssessmentSolution Framing/AssessmentSolution ApproachTransition PlanDetailed Client EnvironmentMacro DesignServer ConsolidationPlanning and Design(SCON)Micro DesignDetailed Transition Plan/Solution BuildPilotImplementDeploy
Data Center Intelligence :Transformational AnalyticsExisting Data CenterOptimized Data CenterAgentsAgentlessDiscoveryScriptsData ImportFlexible Data Acquisition•P2P, P2V, V2V Mappings•Granular Remediation Plans•Virtual Cluster DesignConfiguration DataBusiness AttributesWorkload Patterns•Virtualization•Maintenance Win•CPU Usage•App Stacking•Ownership•Memory Usage•DB Stacking•Physical Locations•Disk I/O Rates•Platform Migration•Availability Levels•Network I/O•Hardware Refresh•Security Zones•VM Overhead•DC Consolidation•Lease Cycles•iSCSI ModelsMulti-Dimensional Analysis “Cube”Technical Constraint Business Constraint Workload Constraint AnalysisAnalysisAnalysisRRRuuuuuullleeesssMMMaaaaaattthhhRRReeesssuuulllttttttsss
There are many benefits of a consolidated server environment, both “Hard Savings” as well as soft savings and cost avoidance•Cost savingsBased on IBM’s experience, the following represents the typical savings that organizations may realize:–Hardware costs reduced 33 to 70%–Maintenance costs reduced up to 50%–Support costs reduced by as much as 33%–Floor space and facility costs reduced 33 to 50%•Improved IT flexibility•Improved business flexibility•A reduction in costs of new hardware/software to host new projects•Reduces the workload on current staff members , allowing them to work on other projects
Consider direct and indirect benefitsDirect benefit -the benefit of a proposed Indirect benefit –the benefit is intuitively solution can easily be measured, the real, but very hard to predict and prove impact is immediate, and the measure financiallyis financial•Reduction of MIPS (Millions of •StaffingInstructions Per Second or other similar non-labor resources)•Budget reduction•Improved productivity•Increased revenue•Improved employee morale•Time value of money•Reduced business impact•Penalties and Incentives•Customer satisfaction•Corporate imageSource: “The Economic Case for Enterprise System Management” white paper•Competitive advantage
Case Study (based on real client case)Final SituationInitial Situation27 Physical Servers6 Physical Servers& 27 Virtual Servers One Time CostsRecurrent CostsOperations Costs StaffCoSoftwarestsFacilitiesMaintenanceElementsServers Capital Migration CostsGrowth & +ExpenditureRefreshmentHW & SW purchase
Benefits Summary (direct) vs. Investment SummaryIT Cost ReductionsYear 1Year 2Year 3TotalServerSoftwareSavings¥¥¥¥ (possible)1,500,000001,500,000Server Software Maintenance Costs¥¥¥¥300,000300,000300,000900,000Server Maintenance Costs¥¥¥¥200,000296,000392,000888,000Server Growth Costs¥¥¥¥600,000600,000600,0001,800,000Server Replacement Costs¥¥¥¥150,000150,000150,000450,000Networking Ports Savings¥¥¥¥16,80025,60034,40076,800Systems Management ¥¥¥¥Labor384,000460,800537,6001,382,400P¥¥¥ower and Facilities C¥osts176,985270,906364,824812,715Data Center Space Costs¥¥¥¥348,000417,600487,2001,252,800Total IT Cost Reductions¥¥¥¥3,675,7852,520,9062,866,0249,062,715Investment SummaryInitialYear 1Year 2Year 3TotalServer Hardware Purchases (IT)¥¥¥¥¥400,000 0 180,000 200,000 780,000 Sftre P¥¥¥¥¥owaurchases (IT)600,000 0 220,000 240,000 1,060,000 Storage Purchases (IT)¥¥¥¥¥200,000 0 40,000 40,000 280,000 Service Purchases ¥¥¥¥¥(IT)1,000,000 0 100,000 100,000 1,200,000 ¥¥Total Capital Investment¥¥¥2,200,000 0 540,000 580,000 3,320,000
3 year cost scenario (direct)K¥12, with current infrastructure27 physical servers10,000Net Saving 8,000over 3 yearsOperating Cost M¥Reduction over M¥Change for consolidation 6,00027 logical servers and 6 physical servers4,00012 months2,000Net Cash M¥0Year 1Year 2Year 3
Energy Efficiency•In addition to the economic advantages of the proposed IBM server optimization solution, the server consolidation project can also lower energy consumption for powering and cooling servers, thus decreasing the environmental impact of the data (As Is) IBM Server Total Annual Annual Power and Cooling RequirementsEnvironmentSolutionSavingsNumber of servers27621Average power consumption per server (Watts)51655010,700Average HVAC consumption per server (Watts)4644959,620Total hourly power and HVAC consumption (Watts)26,4606,27020,190Annual operating hours per server8,7668,766Annual power and HVAC consumption (kWatt hours)231,94854,963176,985Average cost per kWatt hour¥1¥1Total annual power and cooling costs¥231,948¥54,963¥176,985Average COemissions per kWh (in lbs) COemissions (in lbs)311,04273,705237,3372