需求影响评估
项目号 XXXX
客户号 YYYY
<<Note: This document provides a generic template. It may require tailoring to suit a specific client and
project situation.>>
TOGAF™ 9 Template: Requirements Impact Assessment 2
Copyright © 2010 The Open Group. All rights reserved. TOGAF™ is a trademark of The Open Group.
Table of Contents
1 Purpose of this Document .....................................................................................................................................3
2 Basic Details ..........................................................................................................................................................4
3 Impact Assessment ................................................................................................................................................5
4 Recommendations .................................................................................................................................................6
Document Information
Project Name: Project XXX
Prepared By: Document Version No:
Title: Requirements Impact Assessment Document Version Date:
Reviewed By: Review Date:
Distribution List
From Date Phone/Fax/Email
To Action* Due Date Phone/Fax/Email
* Action Types: Approve, Review, Inform, File, Action Required, Attend Meeting, Other (please specify)
Document Version History
Version
Number
Version
Date Revised By Description Filename
TOGAF™ 9 Template: Requirements Impact Assessment 3
Copyright © 2010 The Open Group. All rights reserved. TOGAF™ is a trademark of The Open Group.
1 Purpose of this Document
This document details the Requirements Impact Assessment for <<insert>>.
Throughout the ADM, new information is collected relating to an architecture. As this information is
gathered, new facts may come to light that invalidate existing aspects of the architecture. A Requirements
Impact Assessment assesses the current architecture requirements and specification to identify changes
that should be made and the implications of those changes.
This template shows “typical” contents of a Requirements Impact Assessment and can be adapted to align
with any TOGAF adaptation being implemented.
TOGAF™ 9 Template: Requirements Impact Assessment 4
Copyright © 2010 The Open Group. All rights reserved. TOGAF™ is a trademark of The Open Group.
2 Basic Details
Reference to Specific Requirements
Stakeholder Priority of the Requirements To-Date
TOGAF™ 9 Template: Requirements Impact Assessment 5
Copyright © 2010 The Open Group. All rights reserved. TOGAF™ is a trademark of The Open Group.
3 Impact Assessment
Phases to be Revisited
Phase to Lead on Requirements Prioritization
Results of Phase Investigations and Revised Priorities
TOGAF™ 9 Template: Requirements Impact Assessment 6
Copyright © 2010 The Open Group. All rights reserved. TOGAF™ is a trademark of The Open Group.
4 Recommendations
Recommendations on Management of Requirements
Repository Reference Number